Berth Depths:

Port Taranaki regularly surveys the berth pockets, swing basin and channel. The below table is updated after every survey (as required). Every two years, Port Taranaki contracts a dredge to return the berth pockets, swing basin and channel back to design, or as close as practically possible.

Berth Pocket: Controlling Depth: UKC Requirement at Berth: Maximum permissable Draft:
Main Breakwater-1
6.40m
0.50m
5.90m
Main Breakwater-2
6.80m 0.50m 6.30m
Moturoa-1
6.40m 1.00m 5.40m
Moturoa-2
12.30m 0.70m 11.60m
Newton King Tanker Terminal-1
12.80m 0.70m 12.10m
Newton King Tanker Terminal-2
12.10m 0.70m 11.40m
Blyde-1
11.30m 1.00m 10.30m
Blyde-2
12.70m 0.70m 12.00m